Urjika Consulting & Engineering Solutions Pvt. Ltd. undertook a CNG/CBG plant infrastructure project in Chunar, Uttar Pradesh, involving the supply of a Type 1 CNG Cascade with 3000 WL water capacity.
Urjika Consulting & Engineering Solutions Pvt. Ltd. undertook a CNG/CBG plant infrastructure project in Chunar, Uttar Pradesh, involving the supply of a Type 1 CNG Cascade with 3000 WL water capacity.
The project scope included equipment supply, high-pressure tubing, installation, and commissioning activities. These activities support the integration of gas storage equipment with the associated plant infrastructure and require careful coordination, appropriate installation practices, and adherence to approved engineering procedures.
The project focused on the following equipment and services:
Equipment Supply: Type 1 CNG Cascade – 3000 WL.
High-Pressure Tubing: Tubing work for relevant equipment connections in accordance with the approved design.
Installation: On-site installation and integration of the supplied equipment.
Commissioning: Commissioning activities in accordance with the approved project procedures.
A Type 1 CNG Cascade is a gas storage arrangement that uses all-metal pressure vessels to store compressed natural gas. Cascades are used in CNG infrastructure where gas storage is required to support the intended supply or refuelling configuration.
The 3000 WL specification refers to the cascade's nominal aggregate water capacity of 3,000 litres. Actual usable gas capacity depends on factors such as operating pressure, gas temperature, cylinder configuration, and the system's operating conditions.
High-pressure tubing connects gas storage equipment with other components in the gas system. Proper material selection, routing, support, fitting compatibility, and connection integrity are essential considerations.
Key installation considerations include:
Using tubing and fittings suitable for the specified gas service and design pressure.
Ensuring proper routing, support, and accessibility for inspection and maintenance.
Verifying the integrity of connections through approved inspection and testing procedures.
Confirming that relevant safety provisions are in place before commissioning.
Project Location: Chunar, Uttar Pradesh
Project Date: 13 April 2026
Application: CNG/CBG Plant
Equipment Supplied: Type 1 CNG Cascade – 3000 WL
Project Scope: Equipment Supply, High-Pressure Tubing, Installation & Commissioning
Site Representative: Mr. Mohan Lal
This project highlights the importance of coordinating equipment supply with site installation activities in gas infrastructure projects. Proper high-pressure tubing practices, suitable equipment integration, and commissioning in accordance with approved procedures are essential to the safe and reliable operation of CNG/CBG systems.
The Chunar project reflects Urjika Consulting & Engineering Solutions Pvt. Ltd.'s involvement in CNG/CBG infrastructure through the supply of a Type 1 CNG Cascade – 3000 WL, along with high-pressure tubing, installation, and commissioning activities.
Through its focus on equipment integration and site execution, Urjika continues to support the development of gas infrastructure for India's evolving clean-energy sector.
One Partner. Infinite Possibilities.
CASE STUDY
CASE STUDY
CASE STUDYLet’s discuss how we can deliver it for you.