Case study · CNG/CBG Cascades

50+ cascades supplied, installed and commissioned across three states

Supply, delivery, installation, commissioning and handover of more than 50 cascades at Vijayawada, Hyderabad and Bhopal.

Cascades: 50+Status: Operational

Project overview

The expansion of India’s CNG and CBG infrastructure needs reliable gas storage equipment, backed by efficient delivery, professional installation and proper commissioning.

Urjika has supplied and delivered more than 50 cascades across multiple project locations. Our involvement went beyond supply: site visits, installation, commissioning and final handover took customers from equipment delivery to operation.

Project footprint

Cascade supply and site execution were coordinated across three states:

  • Vijayawada, Andhra Pradesh
  • Hyderabad, Telangana
  • Bhopal, Madhya Pradesh

Execution

  1. 01

    Supply

    Cascades supplied to the project requirements.

  2. 02

    Delivery

    Equipment delivered to the designated locations.

  3. 03

    Site visit

    Site requirements reviewed and execution coordinated.

  4. 04

    Installation

    Required installation work completed.

  5. 05

    Commissioning

    Commissioning completed to establish operational readiness.

  6. 06

    Handover

    Equipment and completed work handed over to the customer.

  7. 07

    Operation

    Cascades in operational use and working well.

Value delivered

  • Multi-location execution across Andhra Pradesh, Telangana and Madhya Pradesh.
  • End-to-end support beyond supply — installation, commissioning and handover.
  • Operational readiness: site activities completed before the equipment goes into service.
  • Reliable coordination through a structured execution approach.
  • Practical, field-oriented engineering focused on usable gas storage infrastructure.

Outcome

With more than 50 cascades supplied and delivered, and site visits, installation, commissioning and handover completed, the cascades are operating and working well.

From supply to commissioning. From delivery to operation.

From the site

Project photos

Cascades positioned at site, with the tubing trench alongside
Cascades positioned at site, with the tubing trench alongside
Tubing routed through the trench between cascades
Tubing routed through the trench between cascades
Underground tubing trench
Underground tubing trench
Fill post panel at the cascade filling bay
Fill post panel at the cascade filling bay
The team marking 50 cascades in 30 days
The team marking 50 cascades in 30 days
Tubing laid to the cascade bay
Tubing laid to the cascade bay
Fill post installed at site
Fill post installed at site