Urjika Consulting & Engineering Solutions Pvt. Ltd. successfully supplied a 4500 WL CNG Cascade – Single Bank and an LCV Fill Post – Single Arm for a CNG infrastructure project in Pilibhit, Uttar Pradesh. The project included installation, commissioning, and final handover, completing the scope of work.
Urjika Consulting & Engineering Solutions Pvt. Ltd. successfully supplied a 4500 WL CNG Cascade – Single Bank and an LCV Fill Post – Single Arm for a CNG infrastructure project in Pilibhit, Uttar Pradesh. The project included installation, commissioning, and final handover, completing the scope of work.
This project highlights the importance of combining suitable high-pressure gas storage equipment with vehicle-refuelling infrastructure to support CNG station operations.
The project covered the supply and deployment of two key components:
4500 WL CNG Cascade – Single Bank: Provides high-pressure CNG storage for the station’s gas supply arrangement.
LCV Fill Post – Single Arm: Provides a dedicated refuelling connection for compatible light commercial vehicles, subject to the system’s approved configuration.
Successful deployment of CNG infrastructure requires appropriate equipment positioning, high-pressure connection integrity, and coordination between the storage system and refuelling equipment.
The project scope included installation and commissioning activities to ensure the supplied equipment was integrated in accordance with the applicable project requirements and approved procedures.
Key considerations included:
Proper positioning and installation of the cascade and fill post.
Verification of high-pressure tubing, fittings, and connections.
Inspection of equipment interfaces and relevant safety provisions.
Commissioning checks before project handover.
Urjika completed the installation, commissioning, and handover of the supplied equipment at Pilibhit, Uttar Pradesh.
The completed project reflects the importance of coordinated execution—from equipment supply through on-site installation and commissioning—to bring CNG infrastructure projects to the handover stage.
Location: Pilibhit, Uttar Pradesh
CNG Storage: 4500 WL Single Bank Cascade
Refuelling Equipment: LCV Fill Post – Single Arm
Installation: Completed
Commissioning: Completed
Handover: Completed
Urjika Consulting & Engineering Solutions Pvt. Ltd. supported the project through equipment supply, installation, commissioning, and handover. By addressing both CNG storage and vehicle-refuelling requirements within the project scope, Urjika contributed to the coordinated execution of the station infrastructure.
The Pilibhit project demonstrates Urjika’s involvement in delivering CNG infrastructure solutions that combine high-pressure storage equipment with vehicle-refuelling systems. With installation, commissioning, and handover completed, the project represents a practical example of integrated equipment supply and on-site execution.